3 Units 4 Axle Tipping Semi Trailer Delivery To Ghana

2022/11/04 10:59

Ghana customer purchase 3 units 4 axle 40m3 tipping trailer from us again, last year he bought 5 units 6 axle 45m3 tipping trailer. These tipping semi trailers will be used to transport various mining materials such as bauxite, limestone, manganese ore etc. As these semi-trailers will be transporting minerals from the northern mines of Ghana to the Takoradi port, we have reinforced the entire chassis of the trailers to improve their service life and to meet the needs of different road conditions.

 

tipping semi trailer

 

The length of the whole tipping semi trailer cargo box is about 11 meters and the height is 1.7 meters, which will cause the center of gravity to be high when the tipping semi trailer is fully lifted up. If the driver does not operate properly, it will easily cause overturning accident. For this situation, we suggest customers to choose U-type cargo box, which has low center of gravity, strong structure, and no residual characteristics of unloading, which is very suitable for transporting gravel and other goods.

 

 u shape cargo box

 

By using NM450 wear-resistant steel plate, the wear-resistant strength of the bottom and side plates is improved, further extending the service life of the cargo box. Adopting robot welding process, the weld seam is even and not easy to crack, and the quality is stable. Other major components are made of famous brands, such as HYVA lifting system to ensure smooth and stable lifting, and FUWA axles with TRIANGLE tires to ensure the normal operation of the semi-trailer. WABCO brand brake valve can improve the brake response time and make driving more safer.

 

detail picture

 

How To Operation Lifting Tipping Semi Trailer Cargo Box ?

 

1. Park the vehicle on a level surface and pull the hand brake valve to the braking position.

2. Put the transmission gear in neutral and place the air control valve in "neutral" gear.

3. Depress the clutch pedal, pull the power take-off switch to the combined position, release the clutch, then the power take-off is combined.

4. Push the pneumatic control valve to "lift" gear, at this time the cargo tank began to lift, you can control the size of the throttle to lift the cargo tank fast and slow.

5. When the cargo box is raised to the ideal position, release the throttle, the air control valve in the "stop" gear.

Related Products